Starfield:Tevina Veth'aal's Computer (Tevina)

From Starfield Wiki
Jump to: navigation, search
Tevina Veth'aal's Computer
Editor ID SFBGS001_MS01_TevinaComputer

Please add a description for Tevina Veth'aal's Computer.

<Add description of terminal>

Menus[edit]

Tevina Veth'aal's Computer
Employment Recommendations The following list includes agents formerly working in the Settled Systems, along with a recommendation for re-assignment.

Military
=============================
Mirsad Jokic - Background: Soldier // Recommendation: Ministry of State

Desmond Taylor - Background: Soldier // Recommendation: Ministry of State

Agriculture and Science
=============================
Visnja Medvedenko
Background: Chemist // Recommendation: House Va'ruun

Sachihiro Ladipo
Background: Astrophysicist // Recommendation: House Va'ruun

Spaceport and Warehouse
=============================
Ochim Sharon
Background: Soldier // Recommendation: Ministry of Conjunction

Carmina Andajar - Background: Smuggling // Recommendation: Ministry of State

Ship Departure Records (Go to Ship Departure Records menu.)
[Decrypted] Copy of Zealot Slate #2032 Children of Jandar,

Our time sits on the crest of a great wave, and it will come crashing into the sons and daughters of Jarek in their moment of weakness. For now, let the waters gather and ripple the hymns of the Great Serpent, in the belly of Jandar's Rest. The coordinates embedded on this slate will point the way.

If you heed the call, come join our communion. When the Hymn is spoken, tell them your name is Promised.

Ship Departure Records
The following lists matches after hours departure records with shipments marked for hold:

Shipments:
05.11.2330: Resource Supply Crate HV-2294G
05.02.2330: Medical Supplies HV-1732W
04.27.2330: Weapons Crate HV-1286K
04.25.2330: Munitions Crate HV-1192K
04.04.2330: Ship Parts HV-0329P

Spaceport Departures [After Hours]:
05.11.2330: Dirge II, Prophecy I, The Cortege
05.02.2330: Revelation III, The Cortege, Eulogy I
04.27.2330: Hymn II, The Cortege, Prophecy I, Dirge I
04.25.2330: The Cortege, Eulogy II
04.04.2330: Prophecy III, Prophecy II, Dirge II, The Cortege

The Cortege - Flight Records (Go to The Cortege - Flight Records menu.)
Watcher's Hymn - Flight Records (Go to Watcher's Hymn - Flight Records menu.)
The Frog's Pulpit - Flight Records (Go to The Frog's Pulpit - Flight Records menu.)
The Cortege - Flight Records
Current flight path Ship: Cortege
Autopilot: Disabled

Speed = 1525 mph (Planned: 1568 mph)
Altitude = 32,000 ft (Planned: 32,000 ft)
Distance = 7,243 kilometers
Direction = NW

Arrivals Filter by ship: The Cortege
Department: Ministry of Conjunction

05.11.2330: Landed
05.02.2330: Landed
04.27.2330: Landed
04.25.2330: Landed
04.04.2330: Landed

Departures Filter by ship: The Cortege
Department: Ministry of Conjunction

05.11.2330: Cleared for takeoff
05.02.2330: Cleared for takeoff
04.27.2330: Cleared for takeoff
04.25.2330: Cleared for takeoff
04.04.2330: Cleared for takeoff

Maintenance Check Check Type: A
Requirement: Routine Inspection

Checklist:
- Check emergency systems
- Inspection of grav and engine systems
- Light structural and shield integrity check

Summary:
A routine check of Grav Drive and engines showed no issues. Structural integrity intact. Shield system showed power loss but within the expected range for the older Vigil class.

Watcher's Hymn - Flight Records
Arrivals Filter by ship: Watcher's Hymn
Department: Ministry of State

05.22.2330: Landed
04.11.2330: Landed
03.16.2330: Landed
01.10.2330: Landed
12.29.2329: Landed

Departures Filter by ship: Watcher's Hymn
Department: Ministry of State

05.17.2330: Cleared for takeoff
04.09.2330: Cleared for takeoff
03.15.2330: Cleared for takeoff
01.06.2330: Cleared for takeoff
12.22.2329: Cleared for takeoff

Maintenance Check Check Type: B
Requirement: Moderate Inspection

Checklist:
- Check flight control systems
- Check boosting, braking, steering, alignment and torque
- Inspection of control systems for corrosion and fluid leakage.
- A Check

Summary:
The maintenance team found an issue with the flight control panel that could lead to braking failure during a boost operation.

The ship was checked in for repairs. Recommend replacement with new panel and ensure all connections are working properly during a test flight.

The Frog's Pulpit - Flight Records
Arrivals Filter by ship: The Frog's Pulpit
Department: Ministry of Conjunction

05.28.2330: Landed
04.11.2330: Landed
03.07.2330: Landed
01.25.2330: Landed
01.01.2330: Landed

Departures Filter by ship: The Frog's Pulpit
Department: Ministry of Conjunction

05.25.2330: Cleared for takeoff
04.07.2330: Cleared for takeoff
03.01.2330: Cleared for takeoff
01.15.2330: Cleared for takeoff
12.31.2329: Cleared for takeoff

Maintenance Check Check Type: C
Requirement: Deep Inspection

Checklist:
- Examination of load-bearing components and functions for corrosion and damage
- Check the operation of the autopilot, grav calculation
- A and B Checks

Summary:
Doing long term maintenance check as this bird has been through the ringer. Also I love the name of this ship, apparently it's a type of flower. I'm imagining a frog on top of a water lily with a bunch of other frogs on lily pads listening intently.