Starfield:Facilities Computer (Descent Facilities Lockdown)
From Starfield Wiki
Facilities Computer | |
---|---|
Editor ID | SFBGS001LC06_02_Descent_FacilitiesLockdownComputer |
Please add a description for Facilities Computer.
<Add description of terminal>
Menus[edit]
Section K Facilities Station | |
---|---|
Security Control System | (Go to Security Control System |
NOTICE: Power Fluctuations | To all personnel:
All research facilities are back online following the installation of the Vortex Interlock on the Reactor level. Minor variances have been detected since that time, but have remained within tolerances. Failsafe systems have been augmented and should trigger automatically should these tolerances be exceeded. Monitor power levels and regularly log results as the new series of experiments for the Pinnacle Project commences. |
Security Control System | |
Research Level Security System Status: ***LOCKDOWN*** | |
Override Lockdown | Security Override: Failed.
ERROR: Critical fault in Vortex Power Modulator NK-015. Proceed to K-Level Facilities Lab and repair or disable this unit. |
Override Lockdown | Security Override: Complete.
Unsealing all doors. |