Starfield:Computer (Maintenance)

From Starfield Wiki
Jump to: navigation, search
Computer
Editor ID SFBGS001LC48_MaintenanceTerminal

Please add a description for Computer.

<Add description of terminal>

Menus[edit]

 
Messages (Go to Messages menu.)
Messages
Update on the Kappa Bunker Project Subject: Update on the Kappa Bunker Project

This communication serves to provide a status update on the Kappa site project.

Effective immediately, you are to suspend all activities on the Kappa site project.

Priority is now the reconstruction of our capital. You are ordered to transport as much material as possible to support these efforts.

All personnel are to ensure that, upon departure, maximum feasible quantities of material are transported to support the capital's reconstruction efforts. Additionally, it is imperative that the bunker entrance is in lock down before leaving the site.

Operations on the Kappa site project will resume once the capital's reconstruction is sufficiently underway.

Follow these orders without delay.

The Va'ruun High Council member - Lovek Veth'aal

Incident Report: Cave-In During Drilling Operations Subject: Incident Report: Cave-In During Drilling Operations

To All Relevant Personnel,

This is to formally report an incident that occurred during the drilling operations for Level 1. A cave-in has transpired, impacting multiple levels of our facility.

--Incident Summary--

Affected Areas:

Level 1: Severe damage at the drilling site for Officer and Regular Living Quarters.
Level 3: Partial compromise of the Engineering Level, specifically the Vehicle Experiment Area.
Level 2: Damage to the Command Center's redundant backup system section.

Immediate Actions:

- Containment: All available personnel have been deployed to contain the affected areas and mitigate further damage.
- Securing the Area: Emergency protocols are in effect to secure the structural integrity of the bunker.
- Damage Assessment: Engineering teams are conducting a comprehensive assessment to determine the extent of the damage and potential risks.

Priorities:

- Safety: Ensuring the safety of all personnel is the highest priority. Adhere strictly to safety protocols and report hazards immediately.
- Stabilization: Efforts are focused on stabilizing the impacted areas to prevent additional cave-ins or structural failures.
- Communication: Maintain open lines of communication. Regular updates will be provided as the situation develops. Report any new developments without delay.

Your strict compliance with emergency procedures is imperative at this time. Further instructions will be communicated as the situation progresses and additional actions are required.

Drilling Officer - Gole Do'Rak

Construction and Furnishing Schedule for Bunker Levels Subject: Construction and Furnishing Schedule for the Kappa site project Levels

To All Relevant Personnel,

As we initiate the construction and furnishing of our bunker, adherence to the following phased schedule is imperative for operational efficiency and security. Below are the designated phases and their respective priorities:

Construction and Furnishing Schedule:

Phase 1:
--Level 0 - Entrance and Initial Security--

- Blast Door: Install robust barrier.
- Security Booth: Construct access monitoring booth.
- Storage Area: Set up storage for supplies.
- Security Gates: Implement additional security layer.

Phase 2:
--Level 3 - Engineering and Maintenance--

Energy Reactor: Install core power source.
Engineering Area: Build maintenance workshop.
Maintenance Area: Establish tool storage space.

Phase 3:
--Level 4 - Water Reservoir and Support Facilities--

Water Reservoir: Develop large storage area.
Changing Room for Workers: Build maintenance personnel facilities.

Phase 4:
--Level 2 - Command Center--

Command Center: Construct operational hub with advanced systems.
Emergency Exit: Integrate concealed emergency exit.

Phase 5:
--Level 1 - Officer and Administrative Zone--

Officer Living Quarters: Provide officer accommodations.
Offices: Set up administrative offices.
Research and Development Area: Establish space for advancements.
Officer Lounge and Restaurant: Finalize relaxation and dining area.

Strict adherence to this schedule is mandatory. All personnel are to execute their assigned tasks with precision and diligence.

Kappa project director - Tanit Sak'Dos

Operational Status Report: Water Reservoir and Energy Generator Subject: Operational Status Report: Water Reservoir and Energy Generator

To All Relevant Personnel,

I am pleased to report that the water reservoir pumping and filtration system, along with the energy generator of our bunker, are operational and functioning at optimal capacity.

Operational Status:

--Water Reservoir System--

The pumping and filtration system of our water reservoir is fully operational and capable of meeting the demands of our facility.
All critical components have been thoroughly inspected and tested to ensure seamless operation.
Water quality parameters are within acceptable limits, guaranteeing the provision of clean and potable water for our personnel.

--Energy Generator--

The energy generator, serving as the backbone of our power supply, is online and functioning efficiently.
Regular maintenance checks have been conducted to uphold its reliability and performance standards.


While a significant portion of these systems is automated, it is imperative that we maintain rigorous monitoring protocols to ensure their continued functionality and efficiency.
By adhering to strict monitoring protocols and proactive maintenance practices, we ensure the resilience and reliability of our bunker infrastructure.

Maintenance Officer - Nikko Karg'lass